
Windover Construction
89 Hopkins Street, Wakefield, MA, 01880

- Luxury Apartments
- Commercial
- Multi-family
- Windover Construction
- R.A. Schaefer & D.M. White, Architects
- Dolben
Supplied and installed our Ohio Drystack Lambris style, in our Pinehills color on this new Luxury apartment complex in Wakefield, MA.
- Spring 2024
Project Overview
In winter to spring 2024, we partnered with R.A. Schaefer & D.M. White Architects and Windover Construction on the brand-new Aster at the Summit just north of Boston.
Aster at The Summit stands as a testament to the perfect blend of convenience and luxury, strategically located at the intersection of I-93 and I-95 in Wakefield, MA. This premier community comprises three expansive buildings housing 173 apartments. With options ranging from studio to three-bedroom homes, Aster at The Summit caters to diverse residential needs while offering a suite of amenities designed to enhance the living experience.
Scope of Work
Entrusted with the design and installation of the exterior stonework for this prestigious project, we proudly supplied and installed our Pinehills Ohio Drystack Lambris selected in partnership early on with the architect and paired with our Patented Clip System™ for a mechanically fastened stone veneer installation.
International Building Code and the Clip System™
As of 2021, the codes for commercial and residential building set forth by the International Code Council (ICC) now equally specify the following for all stone veneer installations falling within Moist (A) and Marine (C) Climates of the US:
“A space or drainage material not less than 3/16” inch in depth shall be added to the exterior side of the water resistive barrier.”
Segovia Clip System™ Example Installation
With some of the most precipitation in the US per year, New England falls within the Moist (A) region of the US under the ICC’s Climate Map making the Clip System a no-brainer. The Clip System’s ¼” built-in drainage plane provides the very best breathability on the market for this wall type, guaranteeing an increased value and longevity in terms of finished product and weather performance.
Two layers of any WRB with the Clip System’s 1/4” built-in drainage plane is both acceptable and code exceeding and in all climate zones. The Clip System’s drainage plane is a continuous, free and open, ventilated airspace.
Client and Partner Acknowledgment
We extend our gratitude to our esteemed partners, R.A. Schaefer & D.M. White, Architects, and Windover Construction, for their collaboration and support in making this project a success.
For more details on our stone products and installation methods, please visit:
Conclusion
The successful completion of the stonework at Aster at The Summit underscores our commitment to quality and excellence in every project we undertake. We are proud to have contributed to creating a luxurious and inviting community space through our innovative stone veneer solutions. With Quality Stone Veneer, the meaning of turnkey goes beyond just supply and install.
Quality Stone Veneer is the go-to manufactured stone veneer supplier and installer for Massachusetts, Connecticut, Rhode Island, Vermont, New Hampshire and Maine! Contact our local Marlborough, Massachusetts office directly at our Contact Us Page.
News:
View our Brand new QuickPack™ Boxes, available in our 6 top selling Ohio Drystack colors!
View QuickPack on our Website Here!
One Manufacturer. One Installer. One Source of Accountability.
Initial Project Rendering: Dolben
Products Used in this Case Study
Request a Free AIA Accredited Lunch and Learn
Quality Stone Veneer is a certified American Institute of Architects Continuing Education Provider.